Energy Update

  • NEA : 9128 MWh
  • Subsidiary Company : 3418 MWh
  • Private Sector : 11795 MWh
  • Import : 12741 MWh
  • Tripping : 3185 MWh
  • Energy Demand : 40267 MWh
  • NEA : 0 MW
  • Subsidiary Company : 0 MW
  • Private Sector : 0 MW
  • Import : 0 MW
  • Tripping : 0 MW
  • Peak Demand : 1970 MW
2024 May 4,Saturday
×

Kathmandu; Finance Minister Dr Prakash Sharan Mahat has said there is an immense potential for hydropower and tourism in Nepal.

At a seminar organized by the Central Committee of the BP Thought Academy here Monday on the occasion of the 110th birth anniversary of BP Koirala, he stressed that emphasis should be laid on infrastructure development to connect hydropower and tourism with economic prosperity as possibilities of hydropower and tourism are increasing in Nepal.

The Finance Minister mentioned that the government has to construct Nijgadh International Airport with high priority. “Though the Nijgadh International Airport had to be constructed before the Lumbini and Pokhara airports, the works of Nijgadh have not been completed for failing to determine priority,” he shared.

Finance Minister Mahat further said the Kathmandu-Terai fast track would be completed within the next four years and the Nijgadh International Airport would also be completed during the period.

He clarified that economic revolution in the country was possible if all joined hands, adding that the private sector should be the means of change and production and the government should play the role of supporter.

“The government has to further increase investment in the health, education and infrastructure sectors. It has to take leadership for the distribution of goods produced by the private sector,” Mahat added.

Conversation

  • Info. Dept. Reg. No. : 254/073/74
  • Telephone : +९७७-१-५३२१३०३
  • Email : [email protected]
© 2024 Urja Khabar. All rights reserved
Contact for advertisement +९७७-१-५३२१३०३
Design By : Nectar Digit