Cosmic Electrical Successfully Completes 132 kV Transmission Line for Mid-Solu
Kathmandu: Cosmic Electrical Limited (CEL) is proud to announce the successful completion of the 132 kV Double Circuit Transmission Line for the 9.5 MW Mid-Solu Hydropower Project (MSHP), located in Solukhumbu District. CEL was responsible for the entire EPC scope — including engineering, procurement, construction, erection, and commissioning...
25 May, 2025