Flood-Hit Rasuwagadhi Hydropower Announces Restart of Full-Scale Production
KATHMANDU; The 111 MW Rasuwagadhi Hydropower Project (RHP), which sustained severe damage during the July 2025 flood in the Bhotekoshi River, has resumed the...
5 July, 2026
KATHMANDU; The 111 MW Rasuwagadhi Hydropower Project (RHP), which sustained severe damage during the July 2025 flood in the Bhotekoshi River, has resumed the...
5 July, 2026