Energy Update

  • NEA : 8631 MWh
  • Subsidiary Company : 6610 MWh
  • Private Sector : 20584 MWh
  • Import : 4095 MWh
  • Tripping : 1320 MWh
  • Energy Demand : 41241 MWh
  • NEA : 0 MW
  • Subsidiary Company : 0 MW
  • Private Sector : 0 MW
  • Import : 0 MW
  • Tripping : 0 MW
  • Peak Demand : 2026 MW
2025 May 21,Wednesday
×

OPINION

Wind turbine development focusing raising countries; based country: Nepal Optimus 60

The global climate change resulting into the drastic average temperature increment year by year is one of the biggest problems which the earth and the human being will very seriously face in the coming decades, if we all do not collectively work against these changes, because we all are responsible for it. There might not be a big discussion in the...

24 January, 2022
  • Info. Dept. Reg. No. : 254/073/74
  • Telephone : +977-1-5321303
  • Email : info@urjakhabar.com
© 2025 Urja Khabar. All rights reserved
Contact for advertisement +977-1-5321303